LOCATION: Vineland, NJ
DESIGN START/COMPLETION: Spring 2014 – Spring 2015
SIZE & TECHNOLOGY: 64 MW Trent 60 Gas Turbine / Dilution Air SCR / Natural Gas Compression / Utility Sub-Station
IN-SERVICE: Spring 2015
FIRM ROLE: Engineering
Waldron was selected as the Engineer of Record for the design of a new peaking facility located adjacent to the Atlantic City Electric Clayville Substation in Vineland, NJ. With the success of the Waldron designed Howard Down Unit #11 project, Vineland Municipal Electric Utility chose to further increase capacity within their service territory. The option was exercised for the purchase of a second Trent 60, SC and natural gas compressor. Waldron developed a detailed design package around the Trent 60 engine and substation interconnection. In addition, Waldron supported VMEU in the selection and oversight of a general contractor to implement our design. The plant was in-service in the Fall of 2015.