top of page

Search Results

98 results found with an empty search

  • ERVING INDUSTRIES MICROGRID PROJECT | Waldron

    < Back to all projects ERVING INDUSTRIES MICROGRID PROJECT LOCATION: Erving, MA DESIGN START: November 2014 SIZE & TECHNOLOGY: 5.6 MW Solar Turbine, Taurus 60 dual fuel combustion turbine with duct-fired heat recovery steam generator IN-SERVICE: December 2015 FIRM ROLE: EPC (Engineer, Procure, Construct), Commissioning Waldron served as the EPC (engineer, procure, construct) contractor for the Erving Paper CHP Project. The job consisted of a new CHP and building located adjacent to the mill’s existing steam plant, and included a Solar Turbines Taurus 60 dual fuel combustion turbine with a duct-fired, 600-psig heat recovery steam generator, connection to the mill’s existing compressed natural gas delivery system, a synthetic natural gas (propane + air) mixing system for secondary fuel to the duct burner, a revised 13.8 kV electrical interconnection with new switchgear, a black start generator, and various upgrades to the existing utility systems necessary to accommodate the project. Waldron worked with the mill and a team of subcontractors to complete engineering, procurement, construction and commissioning of this fast-track project within eighteen months from notice to proceed, working within and around the operating mill.

  • UMASS POWER PLANT & DISTRIBUTION INFRASTRUCTURE SYSTEM STUDY | Waldron

    < Back to all projects UMASS POWER PLANT & DISTRIBUTION INFRASTRUCTURE SYSTEM STUDY LOCATION: Worcester, MA START: Fall 2018 COMPLETION: Spring 2019 FIRM ROLE: Engineering Consultant Waldron has been working on projects on the UMass Medical School Campus for over 20 years. The goal of this power plant and distribution infrastructure system study was to develop the most effective solution from a life cycle perspective to meet the evolving needs of the campus over the next 20—30 years. The three utilities that were studied included electric, steam and chilled water. As part of this project, Waldron performed an assessment of existing equipment and infrastructure, reviewed the current operating strategy, developed a conceptual upgrade to the campus metering scheme, and reviewed over twenty capital projects for their potential benefits to the system. For each of these capital projects Waldron conceptualized a project approach, calculated the life cycle outcomes for the campus using an 8,760-hr utility model, developed capital cost budgets for each, and also reviewed the level of urgency and environmental impacts of each. The project included hydraulic modeling of the steam and chilled water distribution systems, modeling of the electrical distribution system, and development of an 8,760-hr utility model with dispatch algorithms for the combustion turbine, three steam turbines, boilers and chillers within the UMMS facility. These models enabled investment grade accuracy for the life cycle cost analysis associated with each of the capital upgrades that were considered for the facility.

  • JAMAICA PRIVATE POWER COMPANY | Waldron

    < Back to all projects JAMAICA PRIVATE POWER COMPANY LOCATION: Rockford, Jamaica DESIGN START: 1993 IN-SERVICE: Commercial Operation, Q1 – 1998 SIZE & TECHNOLOGY: 64 MW Heavy Fuel Oil (HFO) Slow Speed Diesel Engines with Condensing Steam, Turbine Generator FIRM ROLE: Owner’s Engineer, Start-Up and Commissioning Waldron Engineering was engaged to develop a design concept and technical specification to enable the owner to solicit turnkey construction bids. Subsequent to the initial work, we were retained to start-up; commission and performance test this facility. Waldron acted as the Owner’s Engineer – involved in the project development phase and assisted the owner to develop an EPC RFP and EPC bid evaluation, along with reviewing contractor design and construction submittals. Waldron participated in the project design and construction meetings. In the start-up and commissioning phase Waldron assisted with the equipment start-up crew to start-up the major equipment, develop commissioning plans and performed system commissioning tasks. Waldron also developed the facility performance test protocol, analyzed performance test results and developed the final performance test report. The facility contains two MAN slow speed 30 MW reciprocating engines exhausting into two pressure forced circulation heat recovery steam generators and one 4 MW steam turbine.

  • NATIONAL INSTITUTES OF HEALTH | Waldron

    < Back to all projects NATIONAL INSTITUTES OF HEALTH LOCATION: Bethesda, MD STUDY DATE: May 2016 – April 2017 SIZE & TECHNOLOGY: Combustion Turbine, Chilled Water Storage, Electrical Distribution System FIRM ROLE: Feasibility Study NAICS: 541330, 237130, 237120, 236220, 221112, 221117, 221118, 221121, 221122 Waldron performed a comprehensive utility study for NIH to evaluate the possibility of expanding the existing utility plant. The campus is presently served by a nominal 23 MW cogeneration facility, which is located adjacent to an existing thermal plant consisting of 60,000 tons of nameplate chilled water production capacity, with both steam and electric motor driven chilling capabilities, and five boilers with a nameplate production capacity of 800 kpph. Waldron developed a model for the entire campus utilizing existing utility data, and taking into account infrastructure upgrade projects that were planned, but not yet implemented, including an upgrade to the existing combustion turbine, a modification to the campus electrical distribution system, and the introduction of approximately 8 million gallons of chilled water storage. As part of the analysis Waldron reviewed fuel supply opportunities with local utility, identified electrical switchgear upgrades that would be required to support a new cogeneration option, and analyzed multiple sizes and types of generation to identify the optimal technology and size for additional on-site power generation. As part of the analysis, Waldron reviewed air emission constraints on generator sizing as well.

  • FAA – EMERGENCY GENERATOR PROJECTS | Waldron

    < Back to all projects FAA – EMERGENCY GENERATOR PROJECTS LOCATION: Multiple Locations DESIGN START/COMPLETION: 2002 – 2010 SIZE & TECHNOLOGY: High Reliability Electrical Systems FIRM ROLE: Engineering Design Waldron served as the Engineer for a series of emergency/standby generator upgrades and/or replacements at radar sites across the United States for the Federal Aviation Administration. A typical project included an engine generator, automatic transfer switch, load bank, HVAC upgrades and a fuel tank/pump system.

  • CLAYVILLE PEAKING PLANT | Waldron

    < Back to all projects CLAYVILLE PEAKING PLANT LOCATION: Vineland, NJ DESIGN START/COMPLETION: Spring 2014 – Spring 2015 SIZE & TECHNOLOGY: 64 MW Trent 60 Gas Turbine / Dilution Air SCR / Natural Gas Compression / Utility Sub-Station IN-SERVICE: Spring 2015 FIRM ROLE: Engineering Waldron was selected as the Engineer of Record for the design of a new peaking facility located adjacent to the Atlantic City Electric Clayville Substation in Vineland, NJ. With the success of the Waldron designed Howard Down Unit #11 project, Vineland Municipal Electric Utility chose to further increase capacity within their service territory. The option was exercised for the purchase of a second Trent 60, SC and natural gas compressor. Waldron developed a detailed design package around the Trent 60 engine and substation interconnection. In addition, Waldron supported VMEU in the selection and oversight of a general contractor to implement our design. The plant was in-service in the Fall of 2015.

  • MILFORD REGIONAL MEDICAL CENTER MICROGRID | Waldron

    < Back to all projects MILFORD REGIONAL MEDICAL CENTER MICROGRID LOCATION: Milford, MA DESIGN START: January 2015 SIZE & TECHNOLOGY: 800 kW Reciprocating Engine IN-SERVICE: December 2015 FIRM ROLE: Engineering, Construction, Commissioning The installation of a new combined heat and power (CHP) system at the Milford Regional Medical Center was executed as a fast track project by Waldron. Milford was looking for cost savings and resiliency for their campus. The new CHP system included a packaged 800 kW natural gas fired Caterpillar engine and waste heat recovery. Heat from the jacket water system and the engine exhaust are utilized to produce 15 psig steam for the hospital low pressure system. Energy from the engine lube oil system was recovered and utilized for the domestic hot water system. The CHP system will provide operational cost savings and in the event of a power outage, could supplement the emergency diesel engines to provide power to the hospital. The project was completed in 10 months, from notice to proceed to utility acceptance testing. 600 kW and 600 kWh Energy Storage System (ESS) operating in parallel with the existing CHP and utility. The ESS has the capability to black start the CHP and together can operate isolated from the Grid. With this new ESS addition, Milford Hospital established a highly resilient microgrid system with the option to add PV or other renewable generations. This project is endorsed by MA Dept of Energy Resource (DOER) Resilience Program. An economic benefit of ESS, is that it is able to do peak shaving to reduce the overall energy costs. Scope of work included: Construction Permitting Balance of Point—Detailed Design Review CAT Supplied Equipment Submittals Elevated Gas Permit Variance Construction Commissioning

  • NATICK SOLDIER SYSTEMS CENTER | Waldron

    < Back to all projects NATICK SOLDIER SYSTEMS CENTER LOCATION: Natick, MA STUDY DATE: May 2017 – July 2019 FIRM ROLE: Feasibility Study NAICS: 541330, 237130, 237120, 236220, 221112, 221117, 221118, 221121, 221122 Waldron performed a study on the behalf of Constellation to evaluate the installation of a CHP plant at the NSSC campus. The basis for the study was an hourly utility model that was developed from utility load and cost information supplied by NSSC. The objective of the project was to determine the optimal-sized prime mover, evaluate the financial performance of the project, and develop a cost estimate to construct and commission the facility. Waldron also evaluated the utility modifications and interface changes required to operate the facility electrically as a Microgrid with thermal distribution loops. The recommended configuration is proceeding as a third party paid ESPC project.

  • MRMC BATTERY ENERGY STORAGE SYSTEM | Waldron

    < Back to all projects MRMC BATTERY ENERGY STORAGE SYSTEM LOCATION: Milford, MA DESIGN START: November 2018 IN SERVICE: January 2020 SIZE & TECHNOLOGY: 710 kW/510 kW-Hr FIRM ROLE: Engineering, Construction Management and Commissioning The installation of a Battery Energy Storage System at the Milford Regional Medical Center was executed as an EPC (Engineer-Procure-Construct) project. Milford was looking for resiliency and peak demand reduction for their campus. The new BESS supplements operation of the existing CHP system which included a packaged 800 kW natural gas fired Caterpillar engine and waste heat recovery. The now Hybrid-CHP system will provide operational cost savings and in the event of a power outage, it could supplement the emergency diesel engines to provide power to the hospital. The project was installed in association with the MA-DOER. Scope of work included: Engineering and Design Procurement Permitting Construction Commissioning Turn-over

  • BRIGHAM & WOMEN’S HOSPITAL MICROGRID | Waldron

    < Back to all projects BRIGHAM & WOMEN’S HOSPITAL MICROGRID DESIGN START/COMPLETION: February 2013 – July 2014 SIZE & TECHNOLOGY: 4 MW Reciprocating Engine Generator, 125 psig Waste Heat Boiler, Jacket Water Heat Recovery, (2) 700 BHP Firetube Boilers IN-SERVICE: Summer 2016 FIRM ROLE: Feasibility Study, Schematic Design, Design Development, Detailed Design Waldron Engineering & Construction, Inc. performed an initial feasibility study for Brigham and Women’s Hospital (BWH) to evaluate the feasibility and economic value of installing a Combined Heat and Power Plant (CHP) in their new Brigham’s Building for the Future (BBF). The primary purpose for the CHP was to provide operational cost savings to the hospital and a level of resiliency to serve the energy needs of the facility. In addition to studying various CHP technologies, including combustion turbine generator and reciprocating engine generators, Waldron appraised the value of supplying electrical and thermal energy not only to the new BBF building, but also to the neighboring Shapiro building which is part of the Brigham and Women’s Hospital campus. Upon identifying that a 4 MW reciprocating engine based CHP was the optimal size and technology to serve the two buildings, Waldron executed the detailed design of the entire central energy plant. Waldron served as the engineer of record for the project which included a 4 MW recip-engine based CHP plant with dual fuel firetube boilers that were installed in the basement of Brigham & Women’s Hospital Building for the Future in Boston.

  • YALE UNIVERSITY ELECTRICAL WORK | Waldron

    < Back to all projects YALE UNIVERSITY ELECTRICAL WORK LOCATION: New Haven, CT PROJECT DATES: 2013 – 2016 FIRM ROLE: Designer, Commissioning Waldron has completed multiple projects for Yale University. Below are some of the electrical focused projects that have been completed. 1. Supplemental Generator Project a. Designed and installed 3 mobile generators to provide supplemental power to the Yale University Campus. The mobile generators operate in parallel with existing turbine generators and emergency generators. The three mobile generators run in parallel with each other and have load share capability. b. Controls of the generators are designed to operate the generator from three locations, local manually, chiller plant control room-automatically and the central power plant control room automatically. Controls for the new switchgear were connected into the DCS and existing synch panel for remote control. Raise/Lower voltage and frequency, synch check and other interlocks will be designed as needed. c. Arc Flash Study completed for all new equipment. d. Developed the Sequence of Operation for the generator control system. 2. New Vista Key Control Project a. Designed and commissioned the new Vista Switch Key Interlock Controls between four existing 15KV breakers. The Vista Switch Key Interlock Controls allow the associated 15 KV circuit breaker to be closed on a dead bus when the vista switch is open. This energizes the vista switch on the campus side of the switch and allows the utility to perform phase checks at the vista switch. The vista switch is not allowed to close if the key interlock switch is activated. All synchronizing remains across the 15KV breakers. b. Developed the Sequence of Operation for the Vista Switch Key Interlock control system.

  • ABOUT | Waldron Engineering & Construction, Inc.

    About Waldron specializes in engineering, construction, commissioning and testing of utility plants, peaking plants, combined heat and power, renewable energy, central heating and chilling facilities. As a premier power engineering and construction management firm in the US, Waldron prides itself on being a leader in advancing new and emerging energy production technologies and developing ways to bring them to commercial application. Whether you need engineering design, construction management, commissioning, or a full service EPC firm that can take a project from initial concept to final operation, we can partner with you to deliver the best solutions on time and on budget. Our reputation and exemplary skill set is well respected within the energy–focused community, and we would be delighted to share our references with you. LEADERSHIP OUR PEOPLE HISTORY

© 2023 Waldron Engineering & Construction, Inc. • Waldron Engineering of New York, P.C.

CA Contractor License #1126806

Westchester County HI License #WC-38167-H24

bottom of page