Newington Energy

Waldron Engineering & Construction was engaged to provide Construction Management services for the expansion of the demineralized water facility for the 550 mW combined cycle facility. The project scope includes the addition of a two train system to produce 700 gpm of demineralized water. Waldronís scope included cost estimating, scheduling, prequalification of contractors, system design, development of bid packages, subcontractor oversight, and commissioning.

Waldron Engineering was engaged to act as the Independent Engineer on behalf of the Owner, Con Edison Development.

The installed facility generated 535 MW of electricity using natural gas or No. 2 Fuel Oil. Emissions are controlled using a combination of low NOx combustion and SCR in the HRSG.

Waldron had a full time presence on site to supervise the design, construction, commissioning and testing of the plant on the owner's behalf.