Jamaica Private Power Company
Waldron Engineering was engaged to develop a design concept and technical specification to enable the owner to solicit turnkey construction bids.
Subsequent to the initial work, we were retained to start-up; commission and performance test this facility.
The facility contains two MAN slow speed 30 MW reciprocating engines exhausting into two pressure forced circulation heat recovery steam generators and one 4 MW steam turbine.
Our engagement was the third quarter of 1999.