Skip To Content

Waldron Engineering And Construction

Close

Spotlight on...
Marc Letourneau, P.E.

Marc joined WEI in 2000 and has been an integral part of our team.

Prior to joining Waldron, Marc managed the design, construction and operation of a 12 MW cogeneration facility for a specialty textile manufacturing company. The facility is not now and never has been connected to the local utility's grid.

Marc's strength is in the engineering, installation and start-up of fossil fuel fired cogeneration equipment. In addition to cogeneration plant design, he has coordinated check-out and start-up groups for various projects within manufacturing processes.

Marc is proficient in all phases of design, procurement, installation, commissioning and start-up of electrical generating equipment, compressed air, hot oil, water treatment, HVAC and waste water treatment systems.